Text
Authors: Miguel A. Alonso de Val, Rufino J. Hernández Minguillón, Álvaro Cerezo Ibarrondo. Engineering: Indotec Ingeniería. Developer: Ayuntamiento de Amorebieta. Constructor: Urbelan. Project Date: October 2008. Completion Date: February 2011. Gross external area: 1st Stage: 6.600,36 sqm / 2nd Stage: 1.495,73 sqm. Photographer: José Manuel Cutillas Medina.
Text
The plot of the project houses both the schools, as well as the sports center and housing of the beadle. The building of the sports center in which the intervention is made, is an edificatory set executed in two different moments. The first corresponds to the building of the gym of the adjacent schools and the second, from the 80's, to the rest of the buildings attached to it, which are adapted to the unevenness of the plot.
Two of the original elements are maintained and rehabilitated: the double-height space of the gyms with a roof with inverted concrete beams with numerous skylights; and adjacent to it, the sports court that has a structure independent of the rest of the building covered by metal trusses.
The other uses are located around these elements, maintaining mostly the same position as in the original building. Four volumes are easily formed
Text
Urbarama (Página consultada el 16 de mayo de 2011). Polideportivo Larrea en Amorebieta [ES]. [On-line]. Dirección URL: http://es.urbarama.com/project/polideportivo-larrea